The boiler will resume normal operation once 240 VAC power is restored. The control panel will continue to hold the memory of the pre-programmed set points set by the user.
The boiler will resume normal operation once 240 VAC power is restored. The control panel will continue to hold the memory of the pre-programmed set points set by the user.